Survey Works Procedure

November 18, 2009


Survey Works Procedure

Survey Works Procedure

There is a need of numerous and various type of survey services and survey questions to be provided for most of the activities at different phases during the project period with several survey crews equipped with proper instruments. These survey works will be coordinated by a chief senior survey engineer based at main office premises supported by site crews as well as competent AutoCAD operators, survey engineers, surveyors at the office and sufficient number of office computers and soft wares.

One of the major tasks to be performed by the survey engineers with the supervision of chief senior survey engineer and in coordination with chief engineers of construction teams, falls into Field Engineering activity which includes verification of accuracy of individual drawings and match up of drawings of different disciplines with each other. This is an on going effort to be spent during whole project period to avoid nonconformities and reworks. Each survey crew consists of one surveyor, two operators for optical instruments and two skilled helpers equipped with optical measuring instruments and other necessary survey tools.

See Our Free Engineering Resources

Got something to say?